Record the configuration
Include component versions, configured profiles, trust relationships and relevant deployment settings. Describe the environment and distinguish hardware observations from simulated links. Keep private keys and sensitive customer details out of shared reports.
Record successes and failures
For each acceptance criterion, retain the procedure, expected result, actual result and evidence reference. Include rejection and recovery tests. A signed checkpoint can protect the integrity of a record but cannot establish that its conclusions are correct.
Close each criterion with a recorded result
Mark criteria as passed, failed, blocked or not tested. Record operational impact and unresolved compatibility limits, then assign the remaining work. Separate initial PQC adoption, key rotation and algorithm replacement in the report. Use the findings to decide whether the proposed deployment is ready for its agreed scope.